Q-2, r. 22 - Regulation respecting waste water disposal systems for isolated dwellings

Full text
3.4. Information on the siting of treatment systems: The manufacturer of a treatment system referred to in the first paragraph of section 3.3 must, within 30 days after its installation, send the information concerning its siting to the municipality in whose territory the manufacturer installed the system. The manufacturer must also provide the Minister with that information at the Minister’s request.
O.C. 1158-2004, s. 2; O.C. 12-2008, s. 2.